Overland Ready Mixed is moving it’s Geneva plant operations to Strang, NE. The new plant is erected, floors have been poured and the walls for the office are currently being framed. The next phase of the project is to erect the building around the plant.
Plans call for the project to be completed by November 30 and the plant should be operational by January 1, 2019. The Strang plant will feature a new dry batch plant that can handle 200 yards per hour. The Geneva 1995 Con-E-Co LoPro Plant will be refurbished and moved to Silver Creek to replace a 1976 manual batch plant.
The new plant used 1,500 tons of recycled crushed concrete for the base. The concrete was crushed by Constructors. Ayars & Ayars is the general contractor for the project.