Project Description
Apollo Steel supplied 165 tons of structural and miscellaneous steel to the project. The miscellaneous steel took the shape of metal pan stairs, steel railings for the stairs, decorative stainless steel railing for the balcony, and steel for the trash enclosure and gates. Fabrication started in April 2019, and Apollo’s last delivery took place June 2020.
The general contractor was Brester Construction.